The Cabins are moving along at lightening speed as usual. They have painted the exterior of one of the cabins, have the skylights in and have began the interior insulation. They have also started the benches that will line the inside of the screened in porches.
The Lodge is not slated to be complete before camp starts so they are focusing all their efforts on the cabins till they are done. Until then, they are doing demo and getting the foundational stuff done in the lodge. They have found some floor issues where the old walk-in cooler was and they keep running into underground springs that have to be redirected so the footers can be poured for the foundations. Look what color the lodge used to be!
No comments:
Post a Comment