The 6 inch water line has been put in finally. The yard at the Directors house and the lower parking area was torn up to finish the connection. We are going to use this opportunity to do some needed landscaping in that area. It is the first thing you see when you enter the property so it should present itself in a welcoming and polished manner.
The large vault for the camps new water connection is in. It will require some creative landscaping to disguise it. It is bigger than they made it sound, sticks up above the grade, is right in front of the lodge/old pool area and is quite an eye soar. The good thing about it (and one reason it is so big) is that this is going to be our only metering point for the whole camp. It will allow up to tap into the line anywhere below it without the long permitting process and extra costs. It will also keep us from having more of these vaults all over the place when new buildings and things are put in. So in the big scheme of things, it will be better for the camp and you will not really know it is there when we get done landscaping it.
The electric has been connected to the house now! It is cool to see the lights illuminating from the house in the mornings.
We want to rename the Staff House to something more user friendly and appealing to groups. We thought of Hickory Hideaway or Hickory Hollow since there are lots of hickory trees around it. If anyone has any suggestions, let me know!
Monday, October 13, 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment